SUMMARY OF PROPOSED 2021/22 LOCAL TRANSPORT PLAN [LTP] CAPITAL PROGRAMME ALLOCATIONS

 

Project/Programme

Description

(see Footnotes below for explanation of symbols) 

2021/22 Proposed

Allocation (£’000s)

CAPITAL RENEWAL/MAINTENANCE

Maintaining links and routes to improve………….

Surfaces

Roads #

500

 

Pavement/Footways

500

Drainage

Replacement of failed gullies/soakaways

300

Street Lighting

Replacement of connections and columns @

300

Bridges & Structures

Dyke Road Drive Retaining Wall

320

 

Seafront Highway Arches Renewal Programme

 

 

Phases 3 & 4 design - King’s Road

280

 

Arch 181-182 - King’s Road

100

 

Duke’s Mound Arches

400

Highway Asset Management

Surveys/update inventory/strategy evidence

50

CAPITAL RENEWAL/MAINTENANCE SUB-TOTAL

2,750

 

INTEGRATED/SUSTAINABLE TRANSPORT

Connecting people with……….

Education, Training & Learning

School Streets

50

 

School Travel Plan Measures *

5

SUB-TOTAL

55

Workplaces & job opportunities

Business Travel Plan Measures *

5

 

Personalised Travel Planning *

5

SUB-TOTAL

10

Parks, open spaces & the National Park

Rights of Way Improvement Programme

50

SUB-TOTAL

50

Interchanges

Cycle parking

10

 

Motorcycle parking

10

 

Accessible bus-stops

50

SUB-TOTAL

70

Improving neighbourhoods with……….

Road Safety measures

Collision/casualty reduction sites

100

SUB-TOTAL

100

Air Quality measures

Electric vehicle charging points

50

 

Ultra Low Emission Zone

50

 

SUB-TOTAL

100

Active travel measures

Pedestrian crossings – freestanding sites

25

 

Walking network – incl. dropped kerbs and handrails

100

 

Cycle network

360

 

SUB-TOTAL

485

 

 

 

continued……/

 

Managing links and routes with……….

Technology & Travel Information

‘Intelligent/smart’ Traffic Signals

300

SUB-TOTAL

300

Connecting people and neighbourhoods with, and improving, the ..............

City Centre & Seafront

Valley Gardens:Phases 1 & 2 – completion

50  

 

Valley Gardens:Phase 3 – detailed design and construction **

0

 

Bus Network Infrastructure

100

 

Liveable City Centre

50

 

Active Travel Fund Tranche 1 works

350

SUB-TOTAL

550

General allocations

‘Section 106’ works

Various sites +

43

Minor works

Scheme completion & scoping/Monitoring

25

SUB-TOTAL

68

INTEGRATED/SUSTAINABLE TRANSPORT SUB-TOTAL

1,788

TOTAL LTP ALLOCATIONS

4,538

 

 

Overall funding and budgetary sources/decisions for allocations:-

 

Government

 

LTP Integrated Transport Block Grant Allocation

3,083

LTP Maintenance Block Grant Allocation

1,455

Highway Maintenance Incentive Fund (based on Band 3 assessment)

364

Potholes funding

1,455

Active Travel Fund – Tranche 2

1,900

SUB-TOTAL

8,257

Council

 

Council Borrowing – Street lighting ‘Invest to Save’

1,722

Additional SCRIF capital funding (27/2/20 Budget Council) ***

3,900

Covered cycle racks

500

Low Traffic Neighbourhoods (Hanover pilot scheme)

300

School Streets

50

Brighton Bikeshare Replacement Programme

467

SUB-TOTAL

6,939

Local Enterprise Partnership [LEP]

 

Local Growth Fund – Valley Gardens Phase 3

5,250

SUB-TOTAL

5,250

GRAND TOTALS

20,446

 

Footnotes

# - sum will be increased through addition of Incentive Funding allocation (£364,000 based on Band 3 self-assessment ranking) and Potholes funding (£1.455m).

 

@ - committed contribution to ‘Invest to Save’ project (PR&G Committee – 8/2/16).

 

+ - to enable design and delivery of works associated with approved development.

 

* - indicative contribution to expected continuation of DfT-funded Access Fund for Sustainable Travel project.

 

** - local contribution not required in 2020/21 - funded by LEP Local Growth Fund. Overall scheme costs will also include £20,000 Section 106 money from planning application BH2013/02729.

 

*** - this additional £3.9m was deferred from 2020/21 due to Covid-19 effects on anticipated income.  It will be allocated on the following basis:-

1) with reference to the investment areas included in paragraph 3.8 of this report, which are consistent with the objectives of the current Local Transport Plan and can therefore be included within its associated capital programme;

2) in accordance with Section 55 of the Road Traffic Regulation Act 1984, which enables surpluses generated in respect of parking charges to be applied to eligible council expenditure on public transport services, road improvements and local environmental improvements;

3) with oversight from the council’s 2030 Carbon Neutral Programme Members’ Working Group;

4) taking into consideration the outcomes of the Climate Assembly meetings about Transport which were reported to committee in January 2021; and

5) following consideration of a further report to be brought back to ETS Committee.

 

 

NOTES

·      In many cases, costs indicated within the proposed programme are preliminary estimates. 

·      Expenditure on schemes may need to be increased, reduced or deferred during a financial year as information becomes available, such as survey results, tender returns or unforeseen engineering difficulties. 

·      The timing of construction works may be subject to network co-ordination with other council projects, development, utility companies, contractor availability and weather conditions.